trezor.io
Rate this file (Rating : 5 / 5 with 1 votes)
Inside Fukushima I (Dai-Ichi), nuclear power plant, Japan
trezor.io

Inside Fukushima I (Dai-Ichi), Nuclear Power Plant, Japan

Fukushima I – 8 (planned) - ABWR - April 2012 - - October 2017 - 1,380 MW
Operating history
The plant reactors came online from 1970 through 1979. From the end of 2002 through 2005, the reactors were among those shut down for a time for safety checks due to the TEPCO data falsification scandal. On Feb 28, 2011 TEPCO submitted a report to the Japanese Nuclear and Industrial Safety Agency admitting that the company had previously submitted fake inspection and repair reports. The report revealed that TEPCO failed to inspect more than 30 technical components of the six reactors, including power boards for the reactor's temperature control valves, as well as components of cooling systems such as water pump motors and emergency power diesel generators. In 2008, the IAEA warned Japan that the Fukushima was built using outdated safety guidelines, and could be "serious problem" during a large earthquake. The warning led to the building of an emergency response center in 2010, used during the response to the 2011 nuclear accident.

File information
Filename:374290.jpg
Album name:World & Travel
Rating (1 votes):55555
Keywords:#inside #fukushima #dai #ichi #nuclear #power #plant #japan
Filesize:21 KiB
Date added:Apr 19, 2011
Dimensions:700 x 394 pixels
Displayed:69 times
URL:displayimage.php?pid=374290
Favorites:Add to Favorites