trezor.io
Rate this file (Rating : 5 / 5 with 1 votes)
Inside Fukushima I (Dai-Ichi), nuclear power plant, Japan
trezor.io

Inside Fukushima I (Dai-Ichi), Nuclear Power Plant, Japan

Reactors
The reactors for Units 1, 2, and 6 were supplied by General Electric, those for Units 3 and 5 by Toshiba, and Unit 4 by Hitachi. All six reactors were designed by General Electric. Architectural design for General Electric's units was done by Ebasco. All construction was done by Kajima. Since September 2010, Unit 3 has been fueled by mixed-oxide (MOX) fuel, rather than the low enriched uranium (LEU) used in the other reactors. Units 1–5 were built with Mark I type (light bulb torus) containment structures, Unit 6 has a Mark II type (over/under) containment structure.
Unit 1 is a 460 MW boiling water reactor (BWR-3) constructed in July 1967. It commenced commercial electrical production on March 26, 1971, and was initially scheduled for shutdown in early 2011. In February 2011, Japanese regulators granted an extension of ten years for the continued operation of the reactor. It was damaged during the 2011 Sendai earthquake and tsunami.

File information
Filename:374275.jpg
Album name:World & Travel
Rating (1 votes):55555
Keywords:#inside #fukushima #dai #ichi #nuclear #power #plant #japan
Filesize:55 KiB
Date added:Apr 19, 2011
Dimensions:700 x 463 pixels
Displayed:68 times
URL:displayimage.php?pid=374275
Favorites:Add to Favorites